Ealing Gateway, 26 – 30 Uxbridge Road, London – Mace Como Group

The Project at Ealing Gateway consists of Floor Tiling to Ground Floor Reception area and 6th Floor Lift Cars, Lift Lobby’s & WC’s.
Supply and fix 600x300mm, 600x600mm, 900x600mm & 1200x600mm Format Howell Natural Finish Porcelain Floor Tile. Laid to pattern within the Ground Floor Reception and 6th Floor Lobby and lift cars based on an even m2 split between the sizes.
Supply and Fix 600x70mm Battiscopa Skirting to Match with curved cutting to Matwell Trim.

Supply and Fix 600x300mm and 600x600mm Howell Natural Finished Floor Tiles Laid as a 2 Size Patten Level to 6th Floor Male & Female WC’s.  Supply and Fix 600x300mm Rossini Grip Finished Floor Tiles to 6th Floor – Disabled WC/Shower
Supply and Fix Stainless Steel Square Edge Trim at Doorway Thresholds
Norcros Pro 30 Latex Compound to WC’s & Showers to achieve correct floor levels

Curved Cutting to Matwell

Curved Cutting to Matwell

Laid to pattern

Curved Cutting to Matwell

Main Contractor: Mace Como Group
Client: Henderson Global Investors