High Wycombe Leisure Centre – Handy Cross Development

Elite Tiling Ltd appointed to carry out the Tiling Works at the Handy Cross Development, High Wycombe Leisure Centre for Willmott Dixon Construction.

Works include the eight lane 50m swimming pool with its moveable floor system and sub-aqua dive pit, 20 metre by 8 metre learner pool with moving floor 1.2 metre deep, wet changing village and dry changing areas.

Tiling works are on programme to start May 2015 and complete by Autumn 2015.

Designed by AFLS+P architects.