The Brudenell Hotel

July 28th, 2010

Refurbishment of 40 guest bathrooms & showers using Johnson Tiles Prismatic
glazed ceramic wall tiles, new stone floor to reception and lobby including mosaic
feature and wall tiling to bar area;

Bathrooms: 200 x 100 Prismatics glazed ceramic wall tiles fixed in brickbond
coloured pattern, 450 x 450 Porcelain floor tiles
Reception & Lobby areas: 400 x 400 Regency riven black slate floors,
incorporating two pebble mosaic features.
Bar: 100 x 100 Prismatics glazed ceramic wall tiles

Main contractor: Barnes Construction Ltd
Architect: MBD Interiors
Project completed: April 2010

038A-Brudenell-Hotel

038A-Brudenell-Hotel

Brudenell Hotel

038A-Brudenell-Hotel

84 Eccleston Square, London

July 6th, 2010

Corporate fit-out to new Reception Area, including Lift Cars, Lift lobby and Basement WC and Lobby/Corridor.

Extensive works also to the external entrance steps and landings.

Reception, Lift Lobby, Lift Cars: 600 x 400 St.Aubin Honed Limestone with cut & dressed skirting, finished with Ardex MG grout and Stainless Steel trims.

WC: 450 x 450 Porcelain antique finish wall & floor tiling.

Entrance Steps: Flamed Basalt with honed face & edges, incorporating stainless steel inset tread bars.

Elite Tiling also carried out the screeding to the above areas as part of our contracted works.

Main contractor: ISG InteriorExterior
Architect: Buckley Gray Yeoman
Project completed: February 2009

040A-84-Ecclestone-Square

040A-84-Ecclestone-Square

84 Ecclestone Square

040A-84-Ecclestone-Square

Corporate fit-out to new Reception are, including Lift Cars, Lift lobby and
Basement WC and Lobby/Corridor.
Extensive works also to the external entrance steps and landings.
Reception, Lift Lobby, Lift Cars: 600 x 400 St.Aubin Honed Limestone with cut &
dressed skirting, finished with Ardex MG grout and Stainless Steel trims.
WC: 450 x 450 Porcelain antique finish wall & floor tiling
Entrance Steps: Flamed Basalt with honed face & edges, incorporating stainless
steel inset tread bars.
Elite Tiling also carried out the screeding to the above areas as part of our
contracted works.
Main contractor: ISG InteriorExterior
Architect: Buckley Gray Yeoman
Project completed: February 2009
T140
Refurbishment

BMW Showroom, Tunbridge Wells

July 6th, 2010

BMW corporate specification floor & wall tiling to refurbish showroom to house BMW, Mini Group and BMW Bike brands on one site over 2 floors.

Extensive tiling works were carried out to all three showrooms, workshop, Customer Care areas, Staff rooms & WCs;

BMW Car: 600 x 300 Anthracite Riven Porcelain & 600 x 300 Stardust Grey to showroom floor, plus 600 x 600 Sandstone Porcelain to Sales Area floor

Mini Group: 400 x 400 Crystal Black Matt Porcelain to showroom floor.

BMW Bike: Black Riven Slate 300 x 300 Porcelain to showroom floor.

Workshop: Roben Red Pyramid Anti-slip 200 x 100 laid brickbond to floors.

Over 800m2 wall tiling completed throughout all areas.

Main contractor: LSC
Architect: MDG Architects Ltd
Project completed: February 2007

050D BMW Tunbridge Wells

050D BMW Tunbridge Wells

BMW Tunbridge Wells

050D BMW Tunbridge Wells

Fiveways Corner Pedestrian Subway

May 10th, 2010

Fiveways Corner Subway - Southbound Entrance

Fiveways Corner Subway - Southbound Entrance

Fiveways Corner Subway - Southbound Entrance

Refurbishment of Pedestrian Subway ot Fiveways Corner on the A1 at Hendon, incorporating all walls to stairs & ramps and the underpass.

Tiles used were vitrified glazed ceramics and were individually hand cut from whole tiles on site to form a unique themed coloured mural to the architects design.

Main contractor: Coffey Group
Architect: Mouchel
Project completed: May 2003

Albert Room Royal Artillery

May 9th, 2010

Honourable Artillery Co –   Refurbishment to the toilets, showers and reception of the Honourable Artillery Company’s Private Function facility; at the Grade 2 Listed Armoury House.  Tiling works also carried out to the brand new Basement area within the building. Finished project was opened by HM Queen Elizabeth.

WC & Shower area: 200 x 200 White Glazed Wall Tiling with a 200 x 200 Coloured Border.  450 x 450 Green Slate Flooring with Cut Skirting to Match.

Reception Floor: 600 x 600 Limestone Gascoigne Beige Stone Flooring finished with Stainless Steel Edge Trim.

Main Contractor: Kilby & Gayford Ltd
Project Completed: June 2006

034A-Honourable-Artillery

034A-Honourable-Artillery

Honourable Artillery Exterior

034A-Honourable-Artillery

Priory Place Chelmsford

May 9th, 2010

New Essex County Court Building with Offices situated in Central Chelmsford at the junction of New London Road and Parkway.  Floor and Wall Tiling to 5 Storeys of WCs, Showers, Tea Points and Public Waiting area.

WC and Public Waiting Area Floors: 600 x 600 Natural Porcelain Slip Resistant Tile, with Schluter DILEX-EZ M/G 9 Perimeter Movement Joint.

WC and Shower Room Floors: 600x 300 Natural Porcelain in Colour Sumac; Internal and Externals corners finished with Schluter RONDEC PVC Trim.

Tea Point Mosaic: 25 x 25 Porcelain Mosaic in ‘Sumac’ Finished with Schluter RONDEC PVC Trim.
ARDEX Grouts and Adhesives were used on this project.

Main Contractor: Wilmott Dixon
Architect: SMC Covell Matthews
Project Completed: December 2007

033A-Priory-Place-Chelmsford

033A-Priory-Place-Chelmsford

Priory Place, Chelmsford

033A-Priory-Place-Chelmsford

Newmarket Leisure Centre

May 9th, 2010

A new leisure centre extension comprising two new swimming pools, wet & dry changing areas  & main reception.  Over 3000m2 of Tiling works consisting of works to the Pool Hall, 25 metre Competition Pool, Learner Swimming Pool, Changing Facilities and Reception Area.  Specialist works were carried out including the insertion of Swimming Pool Grating using sand and cement base, and tiled foot ledges and finger grips   along the edge of both the Competition and Learner pools.

Changing Rooms: 200 x 100 White Ceramic Wall Tiles with a Coloured Chequerboard Pattern; 200 x 200 Non slip Floor Tile with 200 x 100 Sit on Skirting.

Swimming Pools: 244 x 119 Olympic White Wall and Floor Pool Tiles with 244 x 119 Olympic Cobalt Blue Lane Markers and Turning Tiles.

Pool Surround: 200 x 100 White, Blue and Lilac Wall Tiles finished with PVC Trim in respective colours.
Treads and Risers were constructed in the Viewing Area using 300 x 300 Non Slip Tiles cut in 160mm high Risers to form stairs.  A 300 x 300 Step Edge tile was also used for the top of each step.
Epoxy Grout was used for all wet areas, such as all tiling within swimming pools and shower areas.

Main Contractor: ISG Jackson
Architect: Saunders Partnership
Project Completed: December 2007

Newmarket Leisure Centre - Main Pool

Newmarket Leisure Centre - Main Pool

Newmarket Leisure Centre - Main Pool

Maserati Ferrari Showroom Colchester

May 9th, 2010

Maserati / Ferrari Showroom Colchester – Extension and Refurbishment to the Showroom for two of the World’s most famous sports car manufacturers.  One of the renowned Lancaster Ferrari franchise, the showroom and workshop stayed operational as the work was carried out.  However the work was done by Elite Tiling with minimal disruptions in separate phases.

Showroom: 600 x 600 Maserati Ferrari White Ivory Graniti Fiandre Porcelain Floor Tiles.
Workshop: 200 x 200 Maserati Ferrari White Ivory Graniti Fiandre Porcelain Floor Tiles.
Also used were Schluter DILEX EKSN Stainless Steel Movement Expansion Joints.

Main Contractor: R.G Carter Colchester
Architect: CCADS Ltd
Project Completed: August 2008

030C-Maserati-Ferrari-Showroom-Colchester

030C-Maserati-Ferrari-Showroom-Colchester

Maserati Ferrari Showroom Colchester

030C-Maserati-Ferrari-Showroom-Colchester

The London Clinic Cancer Centre

May 9th, 2010

This eight storey new-build will be one of the leading cancer centres in the country, providing specialist treatment for patients from around Britain.  Elite Tiling carried out Stone Floor and Skirting works to a 300m2 Ground Floor Reception, as well as Wall Tiling to all WCs located on all eight floors throughout the centre.  The stone reception floor was laid on an in-situ sand cement base with a Full Depth Expansion Joint through the tile and screed.  This method of fixing allowed a truly flat finish once completed.

Reception Floor: 600 x 600 Beige Gascoigne Limestone sealed with Lithofin Stain-stop. 600 x 150 Skirting with a honed and arris finish.
WC Walls: 600 x 600 Cream Satin Porcelain Wall Tiles finished with a Stainless Steel edge bead.

Main Contractor: Shepherd Construction
Architect: Anshen & Allen
Project Completed: November 2009

The London Centre Cancer Clinic Exterior

The London Centre Cancer Clinic Exterior