Riverside Ice and Leisure – Works Completed 2019

July 16th, 2019

Elite Tiling Limited are proud to announce that we have completed the works for Kier Construction at Riverside ice and leisure.

Started in 2017, Chelmsford City Council’s flagship leisure centre has undergone a major redevelopment project. Elite Tiling are proud to have been a part of this scheme in our hometown which started in July 2018 and completed June 2019.

Our works included jet blasting, screed, render and tiling to the main swimming pool, along with one teaching pool and a splash pool with flume. We also carried out wall and floor tiling to pool surrounds and wet changing areas, dry changing areas and reception. The scheme included tiles from Spectile Limited and the use of Ardex adhesives & grout.

The new Riverside Leisure Centre opened for the first time on Saturday 8th June: The first swim – Chelmsford Council held a competition in partnership with BBC Essex to find deserving local heroes to become Riverside’s first swimmers.

The official Royal opening was on the Friday 14th June 2019. Opened by HRH Prince Edward, Duke of Kent.

Works have now commenced at NHow Hotel, City Road, London

March 14th, 2019

Elite Tiling have started on site at NHow Hotel, London for Willmott Dixon Interiors. We are currently carrying out works to the guest room bathrooms and basement gym.  The full scope includes 182 guest rooms, 8 suites, basement gym and changing areas, ground floor bar/restaurant and public WCs.  The works are programmed to continue until June 2019.

 

WC Wall

WC Wall

 

WC Floor

WC Floor

 

Shower Wall

Shower Wall

 

Gym Wall

Gym Wall


Guest Room Bathroom Walls – 200×100 & 100×100 Primus Verde

Guest Room Bathroom Floors – 250×250 Ceramique International Terrazzo Effect Green

Gym Tiles – 150×75 Equipe Evolution White & Black

Marble Calcutta 600 x 600

All Guest Room bathrooms are tanked using a Schluter Kerdi/Ditra waterproofing system.

Adhesive – Norcros S1

Grout – Mapei Ultracolour Plus

Harpur Shopping Centre Completed for Conamar

January 9th, 2019

We are proud to announce the completion of the tiling works at Harpur Shopping Centre, Bedford for Conamar Building Services.

Works at the centre consisted of:

Tiling to floors – 1200m2 to ground floor mall & 370m2 to basement mall – 1200×600 ST3 Forbury Grey with contrasting 1200×600 ST3 Delphina border

Tiling to basement toilets – walls floors & skirtings – 1200×600 ST3 Forbury to floors & 600×300 ST3 Forbury to walls

Tiling to central staircase, treads & risers – 600×300 ST3 Forbury with 3no K Grip Grooves

Tiling to columns throughout the centre – 600×300 ST3 Night Polished

Tiles were fixed using Mapei primer, adhesive and grout.

 

Floor Tiling with Contrasting Band

Floor Tiling with Contrasting Band

Treads and Risers

Treads and Risers

Floor Tiling with Contrasting Band and Columns

Floor Tiling with Contrasting Band and Columns

Tiling to Columns

Tiling to Columns

Works Nearing Completion at 182-184 High Holborn for Collins Construction

December 18th, 2018

Elite Tiling are proud to announce that works are nearing completion at 182-184 High Holborn for Collins Construction. Elite Tiling were awarded the contract to complete the tiling works at the 9-floor office building located in Central London and are carrying out tiling to the Basement Shower walls; Ground-7th Floor Core floors and Basement-7th Floor stairs. In the New Year, Elite Tiling will also be carrying out mosaic floor tiling to the Ground Floor entrances of the building.

Basement Walls- 300×75 Porcelanosa Medite fixed with BAL adhesive and grout

Floors and Stairs- 1200×600 Parkside Ceramics Vale Grey fixed with Norcros adhesive and Ardex grout


Treads

Treads

Treads

 

Tiling Underway at 50-60 Station Road, Cambridge

December 18th, 2018

Elite Tiling are delighted with the progress of the tiling works at 50-60 Station Road, Cambridge for Galliford Try.

The scheme will comprise a new high quality office building arranged over 10 floors including some retail accommodation at ground floor. Tiling works include floor tiling to lift cores and WCs to all levels of the building, as well as the ground floor entrance/reception area. Elite Tiling are also carrying out the fixing of an 18mm ply substrate to the WCs.

Works are on course for completion in early 2019.

Floors- 600×600 Domus Norr Tiles fixed with Mapei adhesive and grout

Floor Tiling

Floor Tiling

Floor Tiling


 

Riverside Ice and Leisure – Tiling Works Underway As Councillor Lays First Tile

October 26th, 2018


Elite Tiling are pleased to announce that the tiling works are now well underway in the main pool and changing rooms at Riverside Ice and Leisure. The project started in July 2018 and, since then, Elite have successfully completed the Jet Blasting, Screed & Render to the Pool Tanks, along with the Screeding to the Changing Areas.


IMG_1424 (003)

Following completion of the screed and render to the main pool, the pool wall tiling has now begun. To mark this milestone in the project, the first wall tile was ceremoniously laid by a Councillor at Chelmsford Borough Council alongside Directors from Kier.

Main Pool

image12

image22

Changing Rooms

image1

IMG_0542 (003)

image1 (003)

Works are scheduled to continue in the main pool as well as wall and floor tiling starting in the learner and splash pools at the beginning of November.


Anglia Ruskin School of Medicine – Tiling Completed for Willmott Dixon

October 19th, 2018

 logo

Elite Tiling are proud to announce completion of the tiling works at the Anglia Ruskin School of Medicine, Chelmsford campus. It will be Essex’s first medical school, training the doctors of the future. Construction began in May 2017 on the new £20 million building which features state-of-the-art skills facilities, specialist teaching space, a lecture theatre, simulation rooms and an anatomy suite. The medical school will complement the existing facilities, such as the £3.4 million SuperLab.

Elite Tiling had the pleasure of working alongside the team at Willmott Dixon on this project, with whom we are proud to be a Category A Supply Chain member.

Tiling works included a 300m2 Reception in 600 x 600 tiles along with tiling to 50nr stair treads and risers from the ground up to the second floor including nosing edges.

Finishes List

Tiles – 600 x 600 Casal Grande Raggio Di Luna

Grout – Mapei Ultracolour 113

Adhesive – Mapei Keraquick Grey

 

Floor Tiling

Floor Tiling

Floor Tiling


 

Elite Tiling Awarded Riverside Ice & Leisure Project for Kier Eastern

June 6th, 2018

We are proud to announce that we have been successful in securing Riverside Ice & Leisure for Kier Eastern in our home town of Chelmsford, Essex.  The project is due to start in July 2018 and Elite will be undertaking the Jet Blasting, Screed & Render to the Pool Tanks, along with the Screeding to the Pool Surrounds & Changing Areas and all Tiling works.

The refurbishment of Riverside Ice & Leisure will include the construction of 3 brand new pools (Main Pool, Leaner Pool & Flume Splash Pool), as well as new changing facilities to both the swimming area and ice rink.  Our works on site will also include floor tiling to the Main Reception area & tiling to the Pool Spectator Seating Stairs.

This project will be carried out using Spectile Wall & Floor Tiles with Ardex Adhesives & Grout.

 

01

 

Project Capella Secured for Kier Construction Major Projects

May 16th, 2018

We are pleased to announce that we have secured Project Capella for Kier Construction Major Projects.  The project is a new build Research Facility for the University of Cambridge; and the tiling works consist of Wall & Floor Tiling to Levels Ground-5th North & South Toilet Cores, Basement Shower Rooms and the Feature Wall Tiling to a Ground Floor Café/Servery.

We commenced work on site in March 2018 and hope to complete in June 2018.

Walls – 316×200 Porcelanosa Jersey Mix, Park Gris, Japan Marine & Blanco Tiles and 300×100 Solus Spirit Series Tiles, fixed with Mapei Adhesive & Grout

Floors – 443×443 Porcelanosa Rodano Acero Tiles, fixed with Mapei Adhesive & Grout.